Project Parameters
Generator Auto-Spec
Required kVA = peak_demand_kW ÷ 0.8 (power factor)
Fuel consumption = generator_kVA × 0.07 L/hr
A 500kVA generator burns ~35 L/hr at part-load — the same whether the crane is lifting or idle. This is the key cost driver on crane sites that the BESS eliminates entirely.
Generator Total Cost
Hire = duration × gen_rate
Fuel = duration × hours_per_week × fuel_consumption × diesel_price
BESS Total Cost
Hire = duration × bess_rate
Charging ≈ £0.28/kWh × avg_demand_kW × hours_per_week × duration
CO₂ Avoided
Diesel CO₂ = fuel_consumption × hours_per_week × duration × 2.68 kgCO₂/litre
Grid CO₂ = avg_demand_kW × hours_per_week × duration × grid_intensity
Net CO₂ avoided = Diesel CO₂ − Grid CO₂
Diesel emission factor: 2.68 kgCO₂ per litre burned (BEIS 2023). Grid carbon intensity: UK average 0.233 kgCO₂/kWh (National Grid ESO, 2024). Charging cost assumes £0.28/kWh grid rate. These are indicative estimates; actual costs vary by site, contract, and usage patterns.
Putting your numbers into perspective
London → New York
for a full year
in an average car
filled with CO₂
at a UK pub
UK salary
season tickets
Cost Comparison
🌱 Environmental Impact